-
Toro Titanium Tube (X gantry for VCORE)
Fournisseur :Toro-3DPrix habituel A partir de €123,00 EURPrix habituelPrix promotionnel A partir de €123,00 EUR -
X-Gantry for RatRig V-Core 4
Fournisseur :SpannSystemePrix habituel A partir de €60,00 EURPrix habituelPrix promotionnel A partir de €60,00 EUR -
PromotionRatRig Toolhead 2024 (Vcore 4.0/3.1)
Fournisseur :BRS-ENGINEERINGPrix habituel A partir de €39,00 EURPrix habituel€78,00 EURPrix promotionnel A partir de €39,00 EURPromotion -
VC4 CNC Toolhead Kit
Fournisseur :BRS-ENGINEERINGPrix habituel A partir de €132,00 EURPrix habituelPrix promotionnel A partir de €132,00 EUR -
Hextudort Plus CNC
Fournisseur :BRS-ENGINEERINGPrix habituel A partir de €65,00 EURPrix habituelPrix promotionnel A partir de €65,00 EUR -
Goliath Hotend
Fournisseur :BRS-ENGINEERINGPrix habituel A partir de €179,00 EURPrix habituelPrix promotionnel A partir de €179,00 EUR -
BRS-Edition Dragon Ultra CF
Fournisseur :BRS-ENGINEERINGPrix habituel A partir de €108,00 EURPrix habituelPrix promotionnel A partir de €108,00 EUR -
[PPS-CF] SINGLE VC4 CNC toolhead (Printed parts Only)
Fournisseur :BRS-ENGINEERINGPrix habituel A partir de €31,00 EURPrix habituelPrix promotionnel A partir de €31,00 EUR -
[PPS-CF] IDEX VC4 CNC toolhead (Printed parts Only)
Fournisseur :BRS-ENGINEERINGPrix habituel A partir de €45,00 EURPrix habituelPrix promotionnel A partir de €45,00 EUR -
[PA12-CF15] SINGLE VC4 CNC toolhead (Printed parts Only)
Fournisseur :BRS-ENGINEERINGPrix habituel A partir de €26,00 EURPrix habituelPrix promotionnel A partir de €26,00 EUR -
[PA12-CF15] IDEX VC4 CNC toolhead (Printed parts Only)
Fournisseur :BRS-ENGINEERINGPrix habituel A partir de €36,00 EURPrix habituelPrix promotionnel A partir de €36,00 EUR
Important informations for all orders!
More-
[IMPORTANT NOTE]: STOCKS
All products in the catalogue are in backorder for several reasons:
BRS beeing a single man company
Most of the orders are customized to each clients, which slow the manufacture repetability process.
The PA12CF15 annealing is a one day process adding to the general manufacturing time
I can give you an ESTIMATED ETA on request in the chat section
-
[December 2025] Manufacture delays (2 days / 3 weeks)
As far as today, I can't make the product in advance, I'm 100% dedicated to close the order following the timeline.
Concerned by the quality that I am proud to give to my product, I do not rush orders manufacture to gain time. That naturally lead to some delays.
Those delays don't concern rails and some other hardware products, which are generally shipped in between 48h to 7 days depending customizations.
1
/
de
2
Un devis specifique?
Vous souhaitez un set de plusieurs kits, voire une demande spécifique? Pour une entreprise? Contactez moi directement







![[PPS-CF] SINGLE VC4 CNC toolhead (Printed parts Only)](http://store.brs-engineering.com/cdn/shop/files/Designsanstitre_24_3233aee1-92ce-4a12-8bcc-9ff7519e21d9.png?v=1765844143&width=533)
![[PPS-CF] IDEX VC4 CNC toolhead (Printed parts Only)](http://store.brs-engineering.com/cdn/shop/files/Designsanstitre_24_c51746cf-63a8-43bf-9c31-4147219c4927.png?v=1765844102&width=533)
![[PA12-CF15] SINGLE VC4 CNC toolhead (Printed parts Only)](http://store.brs-engineering.com/cdn/shop/files/Designsanstitre_24.png?v=1765844009&width=533)
![[PA12-CF15] IDEX VC4 CNC toolhead (Printed parts Only)](http://store.brs-engineering.com/cdn/shop/files/Designsanstitre_24_065b5c5c-4c7e-4cef-80e2-e9fc3c2319f2.png?v=1765844070&width=533)